FACTORY · 12 JAN 2026 · 4 MIN READ
H3 turns three: inside our 6,000 sqm third factory

Opened in 2023, H3 completed the Pathumthani campus — 11,300 square metres across three facilities, bringing every trade under one standard and one QC regime.
“Materials arrive raw; environments leave finished, packed and sequenced for installation.”


From the corten-clad exterior to the pre-assembly floor inside, H3 was purpose-built for the way we work: materials arrive raw and leave as finished environments, packed in install sequence.





